Exercise 2: Turn the Conversation into Project Memory

Your Assignment

The following notes were captured during a concept design review for Project H-214. They are incomplete, inconsistent, and not organized for future use.

Use AI to transform the notes into dependable project artifacts without inventing decisions or ownership.

Raw Meeting Notes

Meeting purpose: Review the initial public-space concept and determine whether the project is ready to advance.

Participants represented: Ownership, hotel operations, brand, architecture, interior design, procurement, technology, and construction.

Discussion Notes

  • The owner representative asked whether the proposed food-and-beverage expansion would generate enough revenue to justify reducing general lobby seating.
  • The owner still wants completion before the summer peak period and asked whether design activities could overlap with early procurement.
  • The general manager said the lobby becomes congested during group arrivals and that the current concept may not provide enough queuing space.
  • The general manager supports digital arrival options but does not support eliminating conventional service positions.
  • Brand advised that the concept requires further review against applicable public-space requirements.
  • Brand also requested a clearer explanation of how the concept supports the intended guest experience rather than simply adding technology.
  • The interior designer proposed replacing the continuous front desk with smaller service positions and a more residential seating arrangement.
  • The architect said the design team needs peak-arrival data, staffing assumptions, and technology requirements before confirming the service-area configuration.
  • Technology noted that the proposed digital experience depends on systems and integrations outside the interior-design scope. No technical owner was identified in the meeting.
  • The construction manager reported that preliminary field observations suggest undocumented utility routing below the lobby floor.
  • Selective investigation may be required, but no one approved investigative work during the meeting.
  • Procurement reported estimated lead times of 18 to 24 weeks for custom millwork and selected decorative lighting concepts.
  • Final selections have not been approved.
  • The owner requested lower-cost finish alternatives that retain the major design idea.
  • The interior designer said premature substitutions could weaken the concept before performance requirements are agreed upon.
  • Hotel operations raised concerns about construction noise during breakfast and evening arrival periods.
  • The construction manager suggested dividing work into smaller phases but warned that additional phases may increase cost and extend the schedule.
  • The team discussed using a temporary check-in location, but the location, duration, technology, staffing, signage, luggage flow, and accessibility were not resolved.
  • The architect requested a consolidated list of decisions needed before the next design submission.
  • No one explicitly approved the concept.
  • The meeting ended because several participants had another call.
  • Someone stated that “we seem generally aligned,” but no alignment check or vote occurred.

• • The next meeting was discussed for approximately two weeks later, but no date was confirmed.

Participant Task

Transform the raw notes into:

  1. Executive summary
  2. Confirmed decisions
  3. Proposed or pending decisions
  4. Risk register
  5. Action-item register
  6. Open questions

Important Rules

  • Do not treat discussion as a decision.
  • Do not assign an action owner unless the notes identify one.
  • Do not create a deadline that does not appear in the notes.
  • Label missing owners and dates as unassigned or not specified.
  • Preserve disagreements rather than smoothing them over.

Show the source statement supporting each decision or action where practical.

Starting Prompt:


Convert these raw hotel renovation meeting notes into an executive summary, confirmed decision log, pending-decision log, risk register, action-item register, and open-question list. Do not infer approval, action owners, deadlines, or agreement. Clearly distinguish facts stated in the notes from conclusions that require verification. Flag contradictions and ambiguous language.

Quality Control Prompt:


Audit your response against the original notes. Identify any decision, owner, date, fact, or conclusion that you added without direct support. Correct those items and identify unresolved ownership.